| Sign In | Join Free | My xpshou.com | 
              
  | 
      
Brand Name : Saibo
Certification : CE/ISO
Place of Origin : China
MOQ : 1 set
Price : negotiation
Payment Terms : T/T, L/C
Supply Ability : 300 sets per year
Delivery Time : 70 working days after received deposit
Packaging Details : Suitable for ocean shipment
Product Name : Stud Panel Roll Forming Machine
Power : 7.5KW+5.5kw
Steel thickness : 1.4mm
Decoiler : Manual or hydraulic
Station : 16 stations + one station for rectify
Roller material : Gcr15
Structure : Steel plate welding
Drive : By chain
1. Specification of the material
| 1 | Suitable Material | Galvanized steel | 
| 2 | Width of the raw material | Acording to the final profile | 
| 3 | Thickness | 1.4mm | 
2. Machine Detailed Parameters
| 1 | Roll Forming 			 
  |  			Steel stud roll forming machine 			 
  |  		
| 2 | Machine structure 			 
  |  			Wire-electrode cutting structure | 
| 3 | Total power |  			 Motor power-7.5kw Hydraulic power-5.5kw |  		
| 4 | Roller stations |  			 
 bout 18 stations + one station for rectify > 
  |  		
| 5 |  			 Productivity 
  |  			0-15m/min | 
| 6 |  			 Drive system 
  |  			By chain | 
| 7 |  			 Diameter of shaft 
  |  			¢70mm solid shaft | 
| 8 |  			 Voltage 
  |  			 			 
 Customized  |  		
| 9 |  			 Color Of The Machine 
  |  			 			 Yellow and blue  |  		
| 10 |  			 Deliver Time 
  |  			70 days | 
| 11 |  			 Terms Of Payment 
  |  			30%T/T 70% pay before shipment | 
3. Profile drawing

4. The Chart of Process Flow

5. Specification of Components
(1) 3T Manual Un-coiler
(2) Main Roll Forming Machine
(3) Hydraulic cutting system
(4) Computer Control Cabinet
6. Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.
| 
                                             | 
                
                        Hydraulic Ceiling Channel Roll Forming Machine Steel Plate Welding Structure 7.5KW Images |